Grand Rapids, MI

This project presented a challenge in that all plant operations, including moving heavy loads of steel, had to continue uninterrupted during construction. In an effort to accommodate these needs, we enclosed a 35-foot tall rail-mounted Gantry crane so we could complete a new 67,000 square foot CECO pre-engineered, metal building and a single story, attached, masonry office building. Asphalt paving, the creation of a retention pond, new landscaping and the installation of extensive drain piping were also part of the construction process.

“Although we had never worked with CD Barnes before, we decided to give them the job based on their good reputation. Their display of superior productivity, safety and efficiency on a tricky 67,000 square foot building showed that CD Barnes knows what they’re doing.” – President